Entry 26 - Testing Method Supervisor
Today I had a supervisor meeting regarding the testing method result. What was required of today was mainly the survey results which included explanations and charts. For my product, I had to do both pre-survey and the survey. Therefore I had two different results that had to be submitted. For the pre-survey I looked back into the old survey papers which I finished before even starting the product. I then turned each of the questions into graphical form and wrote up a conclusion. I did the same exact thing for the survey and I finished the results. Therefore I submitted it on time to Pak Agung, he checked it and there were basically three things that had to be done. First of all I need to submit the evidence, in my case the photographs of signatures from the survey. The next thing to accomplish is to create the evaluation, both process and product. All this is to be submitted on Monday. Even though there are more work to be done, I am still glad that I was able to accomplish what I have done so far.